Reitersberg Tunnel, Germany

The Project:

Reitersberg Tunnel of the Ebensfeld–Erfurt ICE rail link


Contractor:

Alfred Kunz Untertagebau

Swietelsky Tunnelbau

Leonhard Weiss


Tsurumi support:

Christian Kulik (Field Sales)


The Problem:

The 2975 m long tunnel is being cut using mining methods. After the snow melted, the water incidence in the tunnel suddenly rose to a maximum of 20 litres/second. The medium was made highly abrasive by its slurried stone content.


The Solution:

Massive drainage pump of types KTZ411 and KTZ611 (11kW) transport water over a distance of 500m to 1000m. The KTZ series is the perfect contractors' pump due to its good performance. The replacement of wearing parts is very simple. After training by qualified Tsurumi staff, all maintenance can be done independently on site.


При использовании в абразивных и агрессивных средах повышается износ некоторых компонентов. При использовании в вышеупомянутых областях применения износу, как правило, подвержены крыльчатка, мешалка, всасывающая пластина, втулка вала, масляное кольцо, механическое уплотнение, корпус насоса, сетчатый фильтр, корпус двигателя и выпускная муфта. Срок службы этих деталей зависит от рабочих условий и может быть меньше установленного гарантийного периода.
В связи с этим обратите внимание на наши общие положения и условия, которые по вашему запросу мы можем отправить почтой.