Schwarzbach pipe heading, Germany

The Project:


Gelsenkirchen pipe heading, Schwarzbach canal, Germany

Executing company: WÜWA Bau GmbH


The Problem:


The material excavated by the micro-tunnelling machine is pumped by a mud pump into a separating system where coarse parts are separated. The remaining highly abrasive sludge is passed into a receiver. The material deposits due to the intermittent operation of the pump.


Our Solution:


A KRS2-80 with agitator whirls up the abrasive sludge so that it can be pumped off without any problem. Minimum wear is possible due to the application of components of grey cast and chromium cast iron (25% chromium portion).

Download

Aşındırıcı ve korosif kullanım durumunda, belirli parçalarda doğal olarak daha ciddi yıpranma ve aşınma meydana gelecektir. Yukarıdaki bahsedilen tipte uygulama söz konusu olursa pervane, karıştırıcı, emme plakası, şaft kovanı, yağ segmanı, mekanik conta, pompa gövdesi, filtre elemanı, motor karteri ve tahliye bağlantısında yıpranma ve aşınma meydana gelebilir. Çalışma koşullarına bağlı olarak bu parçaların kullanım ömrü ciddi oranda farklılık gösterebilir ve yasal garanti süresinden kısa olabilir.
Bu anlamda lütfen talep ettiğinizde size de gönderdiğimiz genel hüküm ve koşullar belgemizi inceleyin.