NEAT Amsteg and Erstfeld construction sites, Switzerland

The project:


New Transalpine Railway (NEAT), Amsteg and Erstfeld construction sites


Executing company:

RL Pumpenanlagen GmbH, Wollerau


The problem:


Incoming contaminated drainage water from the tunnels are guided to the collection basin of the sand press. This was initially done with standard commercial construction pumps, but the impellers were worn out after a very short time.


Our solution:


Four GPN3-80 Tsurumi mud pumps with agitator were used. This 4-pole jacket-cooled pump is designed for use in the harshest of mud environments, so that the impeller, agitators, and suction plates are fabricated of custom-coated chromium cast iron with a Brinell hardness of 415 to 425. After 6 months of use, almost no wear could be detected.

Download

Aşındırıcı ve korosif kullanım durumunda, belirli parçalarda doğal olarak daha ciddi yıpranma ve aşınma meydana gelecektir. Yukarıdaki bahsedilen tipte uygulama söz konusu olursa pervane, karıştırıcı, emme plakası, şaft kovanı, yağ segmanı, mekanik conta, pompa gövdesi, filtre elemanı, motor karteri ve tahliye bağlantısında yıpranma ve aşınma meydana gelebilir. Çalışma koşullarına bağlı olarak bu parçaların kullanım ömrü ciddi oranda farklılık gösterebilir ve yasal garanti süresinden kısa olabilir.
Bu anlamda lütfen talep ettiğinizde size de gönderdiğimiz genel hüküm ve koşullar belgemizi inceleyin.