Direkt zum Inhalt | Direkt zur Navigation
Buradasınız:

Well pump at Eternit AG, Germany

The project:

Reconstruction of a well, installation and adaptation of a new pump


Customer:

Eternit AG


Performing company:

Haugrund und Runte Elektromaschinenbau GmbH


Project lead at Tsurumi:

Mr. Jürgen Rohring (Regional Sales Lead Construction NRW)


The problem:

Rebuilding of a well system.

Measure: Replacement of three small pumps of "lumberyard quality".

The use of a higher-quality product should permit longer service life and adjustment of each water fountain.


The solution:

Replacement of the three pumps with a Tsurumi model 50UT2.75S (750W, 230V) submersible pump.

This is a portable, rugged pump in a cast iron variant with a vortex impeller.

The pump was modified in such a way that three fountain nozzles can be operated with the option of controlling each water fountain individually or all together.

Download

Aşındırıcı ve korosif kullanım durumunda, belirli parçalarda doğal olarak daha ciddi yıpranma ve aşınma meydana gelecektir. Yukarıdaki bahsedilen tipte uygulama söz konusu olursa pervane, karıştırıcı, emme plakası, şaft kovanı, yağ segmanı, mekanik conta, pompa gövdesi, filtre elemanı, motor karteri ve tahliye bağlantısında yıpranma ve aşınma meydana gelebilir. Çalışma koşullarına bağlı olarak bu parçaların kullanım ömrü ciddi oranda farklılık gösterebilir ve yasal garanti süresinden kısa olabilir.
Bu anlamda lütfen talep ettiğinizde size de gönderdiğimiz genel hüküm ve koşullar belgemizi inceleyin.