Direkt zum Inhalt | Direkt zur Navigation
Buradasınız:

New construction of a rain water retention basin, Rodgau, Germany

The project:

New construction of a rain water retention basin and alteration of the connected wastewater channel


Company carrying out the works

Albert Weil AG, Limburg


Tsurumi supervisor:

Mr. Christian Oremus (Field Sales Team Hessia/Rheinland-Pfalz/Saarland)


The problem:

Due to construction works, a wastewater channel must be relocated and the wastewater must be pumped to another location during this period. The wastewater pumps of various makes were clogging up, due to the very high solids content, and they had to be dismounted for cleaning several times each week.


The solution:

Through the use of the pump type 100C47.5 with a cutting mechanism, clog-free pumping is guaranteed. The cutting up of the occurring solids, such as for instance hygiene articles, feces, etc., prevents blocking of the impeller and guarantees high operational security.

Download

Aşındırıcı ve korosif kullanım durumunda, belirli parçalarda doğal olarak daha ciddi yıpranma ve aşınma meydana gelecektir. Yukarıdaki bahsedilen tipte uygulama söz konusu olursa pervane, karıştırıcı, emme plakası, şaft kovanı, yağ segmanı, mekanik conta, pompa gövdesi, filtre elemanı, motor karteri ve tahliye bağlantısında yıpranma ve aşınma meydana gelebilir. Çalışma koşullarına bağlı olarak bu parçaların kullanım ömrü ciddi oranda farklılık gösterebilir ve yasal garanti süresinden kısa olabilir.
Bu anlamda lütfen talep ettiğinizde size de gönderdiğimiz genel hüküm ve koşullar belgemizi inceleyin.