Direkt zum Inhalt | Direkt zur Navigation
Buradasınız:

Bad Wurzach treatment plant, Germany

The Project:

Eintürnen pumping station of the Bad Wurzach treatment plant


Contractor:

Hurter, Leutkirch


Tsurumi support:

Ernst Mutzel (Field Sales Baden-Württemberg)


The Problem:

The pumping station has always had problems with clogging, and the treatment-plant workers sometimes have to clean the pumps several times a week. Pumps from different manufacturers were tested, but with no improvement in the situation.


The Solution:

Use of a type 100C43.7 cutter pump with a tungsten-carbide blade built into the impeller. This pump shifts large quantities of wastewater and shreds fibrous materials using the built-in cutting mechanism. After ten months, there was not a single case of clogging.

Download

Aşındırıcı ve korosif kullanım durumunda, belirli parçalarda doğal olarak daha ciddi yıpranma ve aşınma meydana gelecektir. Yukarıdaki bahsedilen tipte uygulama söz konusu olursa pervane, karıştırıcı, emme plakası, şaft kovanı, yağ segmanı, mekanik conta, pompa gövdesi, filtre elemanı, motor karteri ve tahliye bağlantısında yıpranma ve aşınma meydana gelebilir. Çalışma koşullarına bağlı olarak bu parçaların kullanım ömrü ciddi oranda farklılık gösterebilir ve yasal garanti süresinden kısa olabilir.
Bu anlamda lütfen talep ettiğinizde size de gönderdiğimiz genel hüküm ve koşullar belgemizi inceleyin.