The Project:


Expansion of the Erasmus railway line between Rotterdam and The Hague.


Executing company:

Ed. Züblin AG

DuraVermeer Groep NVn


The problem:


Using a hydroshield, two 2.3km tunnels with diameter 6.78m will be constructed.During building works the lowering of the groundwater level must be assured.


The solution:


Multiple submersible pumps from the KTV and KTZ series. The special characteristics of Tsurumi pumps, such as an internal mechanical seal, upstream shaft sleeve with gasket and an oil lifter allow them to be used in on-snore-mode over an extended period.

Download

Aşındırıcı ve korosif kullanım durumunda, belirli parçalarda doğal olarak daha ciddi yıpranma ve aşınma meydana gelecektir. Yukarıdaki bahsedilen tipte uygulama söz konusu olursa pervane, karıştırıcı, emme plakası, şaft kovanı, yağ segmanı, mekanik conta, pompa gövdesi, filtre elemanı, motor karteri ve tahliye bağlantısında yıpranma ve aşınma meydana gelebilir. Çalışma koşullarına bağlı olarak bu parçaların kullanım ömrü ciddi oranda farklılık gösterebilir ve yasal garanti süresinden kısa olabilir.
Bu anlamda lütfen talep ettiğinizde size de gönderdiğimiz genel hüküm ve koşullar belgemizi inceleyin.