NoordZuidLijn, Amsterdam, Netherlands

The Project:


Expansion of underground network in Amsterdam; construction of north-south line


Executing companies:

Max Bögl

ARGE Saturn (DuraVermeer and Züblin)

Distrimex b.v.


The problem:


The NordZuidLijn will be a new underground railline crossing Amsterdam from north to south.Amsterdam is situated at sea level, with many canals running through the city and historic sites that require protection. For these reasons, the lowering of the ground water during construction work must be carefully planned; this applies in particular during the building of the Rokin, Vijzelgracht and Ceintuurbaan stations in the city centre. Completion is expected to be in 2013.


The solution:


KTZ and KTV series pumps lower the groundwater during construction work on the underground stations and tunnels. Multiple pumps are kept on standby or are in mobile use.

Download

Aşındırıcı ve korosif kullanım durumunda, belirli parçalarda doğal olarak daha ciddi yıpranma ve aşınma meydana gelecektir. Yukarıdaki bahsedilen tipte uygulama söz konusu olursa pervane, karıştırıcı, emme plakası, şaft kovanı, yağ segmanı, mekanik conta, pompa gövdesi, filtre elemanı, motor karteri ve tahliye bağlantısında yıpranma ve aşınma meydana gelebilir. Çalışma koşullarına bağlı olarak bu parçaların kullanım ömrü ciddi oranda farklılık gösterebilir ve yasal garanti süresinden kısa olabilir.
Bu anlamda lütfen talep ettiğinizde size de gönderdiğimiz genel hüküm ve koşullar belgemizi inceleyin.