Direkt zum Inhalt | Direkt zur Navigation
Buradasınız:

Marmaray Undersea Tunnel, Turkey

The project:


Construction of a railway tunnel under the Bosporus


Executing company:

Taisei Corporation, Japan


The problem:


Construction of a multi-track rail tunnel under the ocean floor to join the two continents. Dewatering the site and keeping it dry during the construction period.


Our solution:


To dewater the site, 14 KTZ pumps and 16 LB pumps were employed in constant use. Due to their robust cast iron design, KTZ pumps are particularly suited for use on tunnel construction sites. The LB pumps are light, single-phase pumps for emergency use.

Download

Aşındırıcı ve korosif kullanım durumunda, belirli parçalarda doğal olarak daha ciddi yıpranma ve aşınma meydana gelecektir. Yukarıdaki bahsedilen tipte uygulama söz konusu olursa pervane, karıştırıcı, emme plakası, şaft kovanı, yağ segmanı, mekanik conta, pompa gövdesi, filtre elemanı, motor karteri ve tahliye bağlantısında yıpranma ve aşınma meydana gelebilir. Çalışma koşullarına bağlı olarak bu parçaların kullanım ömrü ciddi oranda farklılık gösterebilir ve yasal garanti süresinden kısa olabilir.
Bu anlamda lütfen talep ettiğinizde size de gönderdiğimiz genel hüküm ve koşullar belgemizi inceleyin.