Katzenberg Tunnel, Germany

The project:


Treatment and desludging of the process water from the tunnel advance.


Executing company:

Ed. Züblin Umwelttechnik GmbH


The problem:


The fluctuating accumulation of the sludge water from the Katzenberg Tunnel advance is collected in intermediate tanks. The accumulating process water should be pumped into the water treatment plant using submersible pumps.


The solution:


Tsurumi series KTZ contractors' pumps were chosen due to their reliability. Continuous, non-stop operation with high concentrations of sediment is possible with Tsurumi contractors' pumps, securing the operation of the water treatment plant.

Download

Aşındırıcı ve korosif kullanım durumunda, belirli parçalarda doğal olarak daha ciddi yıpranma ve aşınma meydana gelecektir. Yukarıdaki bahsedilen tipte uygulama söz konusu olursa pervane, karıştırıcı, emme plakası, şaft kovanı, yağ segmanı, mekanik conta, pompa gövdesi, filtre elemanı, motor karteri ve tahliye bağlantısında yıpranma ve aşınma meydana gelebilir. Çalışma koşullarına bağlı olarak bu parçaların kullanım ömrü ciddi oranda farklılık gösterebilir ve yasal garanti süresinden kısa olabilir.
Bu anlamda lütfen talep ettiğinizde size de gönderdiğimiz genel hüküm ve koşullar belgemizi inceleyin.