Intermediate access gallery, Stelzen, Germany

The project:


Construction of the Stelzen intermediate access gallery during the building of the Blessberg railway tunnel.


Executing company:

Alfred Kunz Untertagebau GmbH


The problem:


Tunnel drainage under difficult conditions: long adits with a minimum of available space.


The solution:


Type KTZ35.5 pumps were installed in the pipeline as booster pumps. This special solution can be easily implemented with any of our standard contractors' pumps.

Thanks to the simple construction and the patented oil lifter, Tsurumi contractors' pumps can run dry absolutely trouble-free. The minimal cooling due to the flowing medium is sufficient.

Download

Aşındırıcı ve korosif kullanım durumunda, belirli parçalarda doğal olarak daha ciddi yıpranma ve aşınma meydana gelecektir. Yukarıdaki bahsedilen tipte uygulama söz konusu olursa pervane, karıştırıcı, emme plakası, şaft kovanı, yağ segmanı, mekanik conta, pompa gövdesi, filtre elemanı, motor karteri ve tahliye bağlantısında yıpranma ve aşınma meydana gelebilir. Çalışma koşullarına bağlı olarak bu parçaların kullanım ömrü ciddi oranda farklılık gösterebilir ve yasal garanti süresinden kısa olabilir.