ICE railway track Airport Cologne-Bonn

The Project:


Underground railway track to link the Cologne-Bonn airport, Germany

Executing companies:

Consortium Airport tunnel Cologne-Bonn lot 3

Wayss & Freytag Ingenieurbau AG,

E. Heitkamp GmbH, F.C. Trapp AGComplete dewatering (24h-duty) carried out by:

Smet GWT N.V., Dessel, Belgien

Biergans Pumpen-Vertrieb GmbH, Duisburg



The Problem:


Open dewatering by means of submersible pumps.


Our Solution:


The groundwater generated is pumped off by several submersible pumps for abrasive water. 24-h on-snore-operation must be ensured. Currently a total of twenty KTZ21.5 and ten KTZ32.2 is in operation.

Download

Aşındırıcı ve korosif kullanım durumunda, belirli parçalarda doğal olarak daha ciddi yıpranma ve aşınma meydana gelecektir. Yukarıdaki bahsedilen tipte uygulama söz konusu olursa pervane, karıştırıcı, emme plakası, şaft kovanı, yağ segmanı, mekanik conta, pompa gövdesi, filtre elemanı, motor karteri ve tahliye bağlantısında yıpranma ve aşınma meydana gelebilir. Çalışma koşullarına bağlı olarak bu parçaların kullanım ömrü ciddi oranda farklılık gösterebilir ve yasal garanti süresinden kısa olabilir.