The Project:


Extension of the connection road L639,

Florastraße Gelsenkirchen

Executing company:

Heitkamp Erd- und Straßenbau GmbH


The Problem:


Repumping a mixed water channel because a shaft had to be installed.


Our Solution:


Two Tsurumi KRS822 pumped off the dammed water. 720 m³/h were re-passed into the mixed water channel at a distance of 100 m.


This took 3 weeks where the pumps were in service 24 h a day without any failure.


The pumps were laid into the bed of the channel without further installation. No problem for Tsurumi pumps.

Download

Aşındırıcı ve korosif kullanım durumunda, belirli parçalarda doğal olarak daha ciddi yıpranma ve aşınma meydana gelecektir. Yukarıdaki bahsedilen tipte uygulama söz konusu olursa pervane, karıştırıcı, emme plakası, şaft kovanı, yağ segmanı, mekanik conta, pompa gövdesi, filtre elemanı, motor karteri ve tahliye bağlantısında yıpranma ve aşınma meydana gelebilir. Çalışma koşullarına bağlı olarak bu parçaların kullanım ömrü ciddi oranda farklılık gösterebilir ve yasal garanti süresinden kısa olabilir.