Augustaburg tunnel, Erfurt

The Project:


Construction of a railway tunnel with a length of 1480 m.


Executing companies:

ARGE Tunnel Augustaburg, Erfurt

Hochtief Construction AG, Frankfurt

Alpine Bau Deutschland GmbH


The Problem:


Drainage during the underground tunnel heading.


Our Solution:


A Use of type KTZ32.2 submersible pumps operated in 24-hour snore mode for drainage purposes during the tunnel heading. Thanks to their special properties including their internal rotating mechanical seal and upstream shaft protection sleeve with seal, the Tsurumi pumps can be operated in 24-hour snore mode.


The advantages of this design are:

  • Extended service lives
  • Lower costs for spare parts
  • Lower labour costs

Download

Aşındırıcı ve korosif kullanım durumunda, belirli parçalarda doğal olarak daha ciddi yıpranma ve aşınma meydana gelecektir. Yukarıdaki bahsedilen tipte uygulama söz konusu olursa pervane, karıştırıcı, emme plakası, şaft kovanı, yağ segmanı, mekanik conta, pompa gövdesi, filtre elemanı, motor karteri ve tahliye bağlantısında yıpranma ve aşınma meydana gelebilir. Çalışma koşullarına bağlı olarak bu parçaların kullanım ömrü ciddi oranda farklılık gösterebilir ve yasal garanti süresinden kısa olabilir.