Lainz Tunnel, contract section LT31, Austria

The Project:


Construction of a 4km two-track railway tunnel in Vienna


Executing companies:

ARGE LT31 consisting of:

Hochtief Construction AG

Alpine Bau GmbH

Beton- und Monierbau GmbH


The problem:


Water removal from both tunnel tubes during tunnelling works (through loose rock). 5 emergency exit shafts, 30 to 55m deep. Quarrying areas 132 and 145 m2, 6 to 20m beneath existing buildings.


The solution:


Multiple submersible pumps from the KTV, KTZ and LH series. The special characteristics of Tsurumi pumps,such as an internal mechanical seal, upstream shaft sleeve with gasket and an oil lifter allow them to be used in on-snore-mode over an extended period.

I händelse av nötande och korrosivt nyttjande uppstår större naturligt slitage i vissa komponenter. Med hänsyn till tillämpningen ovan kan slitage främst förekomma i pumphjul, omrörare, sugplatta, axelhylsa, oljering, mekanisk tätning, pumphölje, sil, motorhölje och utloppskoppling. Beroende på arbetsvillkoren kan livslängden för dessa delar variera kraftigt och vara kortare än den lagstadgade garantiperioden.
I det avseendet, vänligen uppmärksamma våra allmänna villkor som vi också skickar till dig via e-post på begäran.