Direkt zum Inhalt | Direkt zur Navigation
Du är här:

Bibra Tunnel, Germany

The Project:


The Bibra Tunnel is part of the German Unity construction project No. 8, the extension stretch on the route Nuremberg-Erfurt-Leipzig-Halle- Berlin.


Company involved:

Marti Tunnelbau Bunte


The Problem:


Maintaining water clearance by means of submersible pumps at the tunnel portals and during the tunnel advance.


The Solution:


Use of Tsurumi dirty water submersible pumps of widely differing types to remove water from the tunnel. Thanks to their tough, robust design, and the special internally-located slide-ring seal, Tsurumi pumps can be kept permanently in operation in "on-snore-mode".

I händelse av nötande och korrosivt nyttjande uppstår större naturligt slitage i vissa komponenter. Med hänsyn till tillämpningen ovan kan slitage främst förekomma i pumphjul, omrörare, sugplatta, axelhylsa, oljering, mekanisk tätning, pumphölje, sil, motorhölje och utloppskoppling. Beroende på arbetsvillkoren kan livslängden för dessa delar variera kraftigt och vara kortare än den lagstadgade garantiperioden.
I det avseendet, vänligen uppmärksamma våra allmänna villkor som vi också skickar till dig via e-post på begäran.