Groundwater tanks on B23 Saulgrub, Germany

The project:

City bypass for federal road B23 - 450m groundwater tank through the Saulgrub upland moor between Saulgrub and Unterammergau.


Executing company:

HOCHTIEF Infrastructure GmbH, Southeast Germany branch


Tsurumi consultants:

Mr. Christian Kulik (External sales force Bavaria)


The problem:

During implementation of the Saulgrub bypass, a 450m seciond of federal road B23 had to be taken through an underpass under the Murnau-Oberammergau railway. The area is permanently underwater, and ground and strata water also entered. Water retention using well pumps is essential.


The solution:

Open water retention using small, single-phase model HS2.75S wastewater pumps, controlled by float switches. Three-phase model KTV2-15 and KTV2-22 wastewater pumps run in 24-hour sip operation.

I händelse av nötande och korrosivt nyttjande uppstår större naturligt slitage i vissa komponenter. Med hänsyn till tillämpningen ovan kan slitage främst förekomma i pumphjul, omrörare, sugplatta, axelhylsa, oljering, mekanisk tätning, pumphölje, sil, motorhölje och utloppskoppling. Beroende på arbetsvillkoren kan livslängden för dessa delar variera kraftigt och vara kortare än den lagstadgade garantiperioden.