Direkt zum Inhalt | Direkt zur Navigation
Nalazite se ovde:

Volme Gallery at Town hall, Hagen

The Project:


Construction of the Volme Gallery at the Town hall in Hagen, Germany

Executing company:

Wiemer & Trachte AG, Dortmund


The Problem:


Pumping off the ground water via open dewatering.


Our Solution:


The groundwater generated is pumped off by several submersible pumps for dirty water. 24-h on-snore-operation must be ensured.


A total of twelve KTZ31.5 and five KTZ45.5 was in operation.

Download

U slučaju abrazivnog i korozivnog korišćenja, u nekim komponentama može doći do prirodnog habanja. U pogledu gornje primene do habanja može doći pre svega kod rotora, agitatora, usisne ploče, rukavca vratila, uljanog prstena, mehaničke zaptivke, kućišta pumpe, sita, kućišta motora i ispusne spojnice. Radni vek ovih delova može znatno da varira zavisno od radnih uslova i može biti kraći od garantnog perioda.
U tom smislu obratite pažnju na naše opšte uslove korišćenja koje vam takođe na zahtev šaljemo poštom.