Tunnel U2/2, Vienna, Austria

The Project:


Construction of an underground railway tunnel with a length of 1500 m.


Executing company:

ARGE Tunnel U2/2 Taborstraße, Vienna, Austria

Östu-Stettin Hoch- und Tiefbau GmbH

G. Hinteregger &Söhne Bauges.m.b.H.

Wayss&Freytag Ingenieurbau AG


The problem:


Drainage of the underground tunnel heading with the aid of submersible pumps.


Our Solution:


Use of submersible pumps of the KTV series which can reliably ensure drainage in 24-hour snore mode during the heading work.

Thanks to their special properties including their internal rotating mechanical seal and upstream shaft protection sleeve with seal, the Tsurumi pumps can be operated in 24-hour snore mode.

Download

U slučaju abrazivnog i korozivnog korišćenja, u nekim komponentama može doći do prirodnog habanja. U pogledu gornje primene do habanja može doći pre svega kod rotora, agitatora, usisne ploče, rukavca vratila, uljanog prstena, mehaničke zaptivke, kućišta pumpe, sita, kućišta motora i ispusne spojnice. Radni vek ovih delova može znatno da varira zavisno od radnih uslova i može biti kraći od garantnog perioda.