Schmücketunnel, Germany

The project:


Schmücketunnel, Heldrungen, Thuringia

Section of the A71, two pipes with a length of 1720m (east pipe) and 1,729m (west pipe) respectively.


Executing companies:

Baresel GmbH

Alfred Kunz Untertagebau GmbH

Kirchner Hoch- u. Ingenieurbau GmbH


The problem:


Execution of open dewatering under consideration of unexpected water inrush due to changing building ground.


The solution:


Implementation of multiple KTZ and KTV series submersible pumps. Maximum reliability, 24h-operation possible thanks to their suitability for dry running.

Download

U slučaju abrazivnog i korozivnog korišćenja, u nekim komponentama može doći do prirodnog habanja. U pogledu gornje primene do habanja može doći pre svega kod rotora, agitatora, usisne ploče, rukavca vratila, uljanog prstena, mehaničke zaptivke, kućišta pumpe, sita, kućišta motora i ispusne spojnice. Radni vek ovih delova može znatno da varira zavisno od radnih uslova i može biti kraći od garantnog perioda.
U tom smislu obratite pažnju na naše opšte uslove korišćenja koje vam takođe na zahtev šaljemo poštom.