The Project:


Construction of the road tunnel B236n in Dortmund-Berghofen

Executing company: Bilfinger Berger AG


The Problem:


Open dewatering during the underground tunnel heading and also cut-and-cover work with the aid of submersible pumps.


Our Solution:


Pumps of types KTZ32.2, KTZ45.5 and KTV22.2 were used. Continuous snore mode and the possibility of dry running are possible with Tsurumi pumps and secure driving at this construction site.



Download

Dumper in the tunnel
U slučaju abrazivnog i korozivnog korišćenja, u nekim komponentama može doći do prirodnog habanja. U pogledu gornje primene do habanja može doći pre svega kod rotora, agitatora, usisne ploče, rukavca vratila, uljanog prstena, mehaničke zaptivke, kućišta pumpe, sita, kućišta motora i ispusne spojnice. Radni vek ovih delova može znatno da varira zavisno od radnih uslova i može biti kraći od garantnog perioda.
U tom smislu obratite pažnju na naše opšte uslove korišćenja koje vam takođe na zahtev šaljemo poštom.