Remediation, wastewater sewer, Cologne

The Project:


Remediation of a wastewater sewer, stormwater treatment SKO 405 Cologne


Executing company

F.C. Trapp Tief- und Straßenbau Köln GmbH


The Problem:


Pumping of the wastewater arising during the 8month construction period including complete construction and laying out of a DN 250 pressure line with a length of 1200 m including overpasses and transverse sections.


Our Solution:


Three wastewater pumps of type 100C411 with non-clog impeller with cutter were used. The special impeller comminutes solid matter that arises so that blockages cannot occur. Operational reliability held the highest priority here.

Download

U slučaju abrazivnog i korozivnog korišćenja, u nekim komponentama može doći do prirodnog habanja. U pogledu gornje primene do habanja može doći pre svega kod rotora, agitatora, usisne ploče, rukavca vratila, uljanog prstena, mehaničke zaptivke, kućišta pumpe, sita, kućišta motora i ispusne spojnice. Radni vek ovih delova može znatno da varira zavisno od radnih uslova i može biti kraći od garantnog perioda.
U tom smislu obratite pažnju na naše opšte uslove korišćenja koje vam takođe na zahtev šaljemo poštom.