Direkt zum Inhalt | Direkt zur Navigation
Nalazite se ovde:

Moosach subway tunnel, Munich, Germany

The project:


Renovation of the U3 between the Olympia shopping centre and Moosach


Executing company:

ARGE U-Bahn Line 3 North, construction lot 2: Wayss&Freytag Ingenieurbau Hochtief Construction Bauer Spezialtiefbau


The problem:


Groundwater drainage during the entire construction phase: Laying of sewers, construction of subway tunnels and stations.


Our solution:


Multiple submersible pumps from the LSC series (puddle sucker) were used. The special characteristics of Tsurumi pumps, such as an internal mechanical seal, upstream shaft sleeve with gasket and an oil lifter allow them to be used in snore mode over an extended period.

Download

U slučaju abrazivnog i korozivnog korišćenja, u nekim komponentama može doći do prirodnog habanja. U pogledu gornje primene do habanja može doći pre svega kod rotora, agitatora, usisne ploče, rukavca vratila, uljanog prstena, mehaničke zaptivke, kućišta pumpe, sita, kućišta motora i ispusne spojnice. Radni vek ovih delova može znatno da varira zavisno od radnih uslova i može biti kraći od garantnog perioda.
U tom smislu obratite pažnju na naše opšte uslove korišćenja koje vam takođe na zahtev šaljemo poštom.