Katzenberg Tunnel, Germany

The project:


Treatment and desludging of the process water from the tunnel advance.


Executing company:

Ed. Züblin Umwelttechnik GmbH


The problem:


The fluctuating accumulation of the sludge water from the Katzenberg Tunnel advance is collected in intermediate tanks. The accumulating process water should be pumped into the water treatment plant using submersible pumps.


The solution:


Tsurumi series KTZ contractors' pumps were chosen due to their reliability. Continuous, non-stop operation with high concentrations of sediment is possible with Tsurumi contractors' pumps, securing the operation of the water treatment plant.

Download

U slučaju abrazivnog i korozivnog korišćenja, u nekim komponentama može doći do prirodnog habanja. U pogledu gornje primene do habanja može doći pre svega kod rotora, agitatora, usisne ploče, rukavca vratila, uljanog prstena, mehaničke zaptivke, kućišta pumpe, sita, kućišta motora i ispusne spojnice. Radni vek ovih delova može znatno da varira zavisno od radnih uslova i može biti kraći od garantnog perioda.
U tom smislu obratite pažnju na naše opšte uslove korišćenja koje vam takođe na zahtev šaljemo poštom.