The Project:


Underground railway track to link the Cologne-Bonn airport, Germany

Executing companies:

Consortium Airport tunnel Cologne-Bonn lot 3

Wayss & Freytag Ingenieurbau AG,

E. Heitkamp GmbH, F.C. Trapp AGComplete dewatering (24h-duty) carried out by:

Smet GWT N.V., Dessel, Belgien

Biergans Pumpen-Vertrieb GmbH, Duisburg



The Problem:


Open dewatering by means of submersible pumps.


Our Solution:


The groundwater generated is pumped off by several submersible pumps for abrasive water. 24-h on-snore-operation must be ensured. Currently a total of twenty KTZ21.5 and ten KTZ32.2 is in operation.

Download

U slučaju abrazivnog i korozivnog korišćenja, u nekim komponentama može doći do prirodnog habanja. U pogledu gornje primene do habanja može doći pre svega kod rotora, agitatora, usisne ploče, rukavca vratila, uljanog prstena, mehaničke zaptivke, kućišta pumpe, sita, kućišta motora i ispusne spojnice. Radni vek ovih delova može znatno da varira zavisno od radnih uslova i može biti kraći od garantnog perioda.