Consortium Kleine Emscher, Duisburg

The project:


Micro-tunnel pipe heading DN3200/80m

DN 2400/600m and DN1400/120m

Executing companies:

Echterhoff GmbH & Co. KG

F.C. Trapp Tief- u. Straßenbau GmbH


The problem:


Pumping off or drainage of the arising ground water containing sand during pipe heading by open dewatering.


Our solution:


The arising ground water is pumped off with a KRS-69 pump, including all the sand contained. A 24-h on snore mode operation must be ensured.

Download

U slučaju abrazivnog i korozivnog korišćenja, u nekim komponentama može doći do prirodnog habanja. U pogledu gornje primene do habanja može doći pre svega kod rotora, agitatora, usisne ploče, rukavca vratila, uljanog prstena, mehaničke zaptivke, kućišta pumpe, sita, kućišta motora i ispusne spojnice. Radni vek ovih delova može znatno da varira zavisno od radnih uslova i može biti kraći od garantnog perioda.
U tom smislu obratite pažnju na naše opšte uslove korišćenja koje vam takođe na zahtev šaljemo poštom.