Cologne/Bonn airport connection, Germany

The Project:


Connection of the newly built road for Cologne/Bonn airport

Executing Company

Heitkamp GmbH, Wayss&Freytag AG,

Trapp GmbH


The Problem:


Maintainance of water level in a rainwater storage basin at the building site.


Our Solution:


Installation of 2 submersible pumps KTVE21.5 and KTVE22.2. The advantage here is in the integrated level control unit via electrodes. A separate floater cable does not have to be laid. The space required is determined by the diameter of the pump. In contrast to floaters, electrodes do not have to be readjusted. The level can be varied without any difficulty by mounting a screw.

Download

U slučaju abrazivnog i korozivnog korišćenja, u nekim komponentama može doći do prirodnog habanja. U pogledu gornje primene do habanja može doći pre svega kod rotora, agitatora, usisne ploče, rukavca vratila, uljanog prstena, mehaničke zaptivke, kućišta pumpe, sita, kućišta motora i ispusne spojnice. Radni vek ovih delova može znatno da varira zavisno od radnih uslova i može biti kraći od garantnog perioda.
U tom smislu obratite pažnju na naše opšte uslove korišćenja koje vam takođe na zahtev šaljemo poštom.