Airport link Cologne/Bonn

The Project:


Underground railway track to link the Cologne/Bonn Airport, Germany

Executing companies:

Consortium airport link Cologne/Bonn lot 3

Wayss&Freytag AG, E. Heitkamp GmbH,

Bauer Spezialtiefbau GmbH, F.C. Trapp AG


The Problem:


A DB400 sewage water pipeline has to be installed through the progressing soil excavation.


Our Solution:


To re-pump the dirty water generated, submersible pumps for abrasive water of the types KRS65.5 and KTZ45.5 were installed in the existing shaft. Installation includes all hose connections and the emergency generator.

Download

U slučaju abrazivnog i korozivnog korišćenja, u nekim komponentama može doći do prirodnog habanja. U pogledu gornje primene do habanja može doći pre svega kod rotora, agitatora, usisne ploče, rukavca vratila, uljanog prstena, mehaničke zaptivke, kućišta pumpe, sita, kućišta motora i ispusne spojnice. Radni vek ovih delova može znatno da varira zavisno od radnih uslova i može biti kraći od garantnog perioda.
U tom smislu obratite pažnju na naše opšte uslove korišćenja koje vam takođe na zahtev šaljemo poštom.