Direkt zum Inhalt | Direkt zur Navigation
Nalazite se ovde:

Feldhofe mud dump site, Germany

The Project:


To treat the surface discharge water before it enters the receiving water course.


Executing company:

Firma PLA Pumpen und Anlagenbau GmbH

22844 Norderstedt


The problem:


The discharge water of the Feldhofe mud dumpsite is heavily laden with Fe-ions. Treatment of the surface discharge water is necessary before it enters the receiving watercourse.


The solution:


Treatment via oxidation and iron oxide precipitation, assisted by a 2.2kW submersible aerator. Since the bottom of the natural water body is uneven and muddy, a base plate was welded on and the aerator sunk using a crane. Oxygen measurements made after installation (using DO electrodes) were highly satisfactory.

Download

U slučaju abrazivnog i korozivnog korišćenja, u nekim komponentama može doći do prirodnog habanja. U pogledu gornje primene do habanja može doći pre svega kod rotora, agitatora, usisne ploče, rukavca vratila, uljanog prstena, mehaničke zaptivke, kućišta pumpe, sita, kućišta motora i ispusne spojnice. Radni vek ovih delova može znatno da varira zavisno od radnih uslova i može biti kraći od garantnog perioda.
U tom smislu obratite pažnju na naše opšte uslove korišćenja koje vam takođe na zahtev šaljemo poštom.