Direkt zum Inhalt | Direkt zur Navigation

Feldhofe mud dump site, Germany

The Project:


To treat the surface discharge water before it enters the receiving water course.


Executing company:

Firma PLA Pumpen und Anlagenbau GmbH

22844 Norderstedt


The problem:


The discharge water of the Feldhofe mud dumpsite is heavily laden with Fe-ions. Treatment of the surface discharge water is necessary before it enters the receiving watercourse.


The solution:


Treatment via oxidation and iron oxide precipitation, assisted by a 2.2kW submersible aerator. Since the bottom of the natural water body is uneven and muddy, a base plate was welded on and the aerator sunk using a crane. Oxygen measurements made after installation (using DO electrodes) were highly satisfactory.

V prípade použitia v abrazívnom alebo korozívnom prostredí sa niektoré súčasti prirodzene opotrebujú rýchlejšie. S ohľadom na takúto aplikáciu sa opotrebenie môže týkať hlavne obežného kolesa, miešadla, sacej dosky, puzdra hriadeľa, olejového tesnenia, mechanického tesnenia, krytu čerpadla, sita, krtyu motora a spojky odtoku. V závislosti od pracovných podmienok sa životnosť týchto súčastí môže podstatne líšiť a byť kratšia než zákonná záručná doba.
Preto, prosím, vezmite do úvahy naše všeobecné zmluvné podmienky, ktoré vám na vyžiadanie zašleme poštou.