Direkt zum Inhalt | Direkt zur Navigation
Ste tu:

Moosach subway tunnel, Munich, Germany

The project:


Renovation of the U3 between the Olympia shopping centre and Moosach


Executing company:

ARGE U-Bahn Line 3 North, construction lot 2: Wayss&Freytag Ingenieurbau Hochtief Construction Bauer Spezialtiefbau


The problem:


Groundwater drainage during the entire construction phase: Laying of sewers, construction of subway tunnels and stations.


Our solution:


Multiple submersible pumps from the LSC series (puddle sucker) were used. The special characteristics of Tsurumi pumps, such as an internal mechanical seal, upstream shaft sleeve with gasket and an oil lifter allow them to be used in snore mode over an extended period.

V prípade použitia v abrazívnom alebo korozívnom prostredí sa niektoré súčasti prirodzene opotrebujú rýchlejšie. S ohľadom na takúto aplikáciu sa opotrebenie môže týkať hlavne obežného kolesa, miešadla, sacej dosky, puzdra hriadeľa, olejového tesnenia, mechanického tesnenia, krytu čerpadla, sita, krtyu motora a spojky odtoku. V závislosti od pracovných podmienok sa životnosť týchto súčastí môže podstatne líšiť a byť kratšia než zákonná záručná doba.
Preto, prosím, vezmite do úvahy naše všeobecné zmluvné podmienky, ktoré vám na vyžiadanie zašleme poštou.