Direkt zum Inhalt | Direkt zur Navigation
Ste tu:

Dülmen micro-tunneling, Germany

The Project:


Dülmen canal construction - micro tunneling, Germany


Executing company:

Fa. Jordan Tiefbau GmbH & Co. KG

Kierdorfer Str. 65

D-50169 Kerpen


The Problem:


The soil loosened at the fron when heading is returned to the pressing pit and must be removed here and disposed.


Our Solution:


The viscous concentrated soil could be sucked off ba a KTZ pump with "suction hat" (reversed inlet strainer).

The specific advantage was the operation of the pump which could be used also during pressing. Transporting off was simple as it was possible to pump the drilling material directly into the containers provided.

No tank truck was necessary.

V prípade použitia v abrazívnom alebo korozívnom prostredí sa niektoré súčasti prirodzene opotrebujú rýchlejšie. S ohľadom na takúto aplikáciu sa opotrebenie môže týkať hlavne obežného kolesa, miešadla, sacej dosky, puzdra hriadeľa, olejového tesnenia, mechanického tesnenia, krytu čerpadla, sita, krtyu motora a spojky odtoku. V závislosti od pracovných podmienok sa životnosť týchto súčastí môže podstatne líšiť a byť kratšia než zákonná záručná doba.
Preto, prosím, vezmite do úvahy naše všeobecné zmluvné podmienky, ktoré vám na vyžiadanie zašleme poštou.