Construction of a new culvert, Kleuterbach, Germany

The Project:


Replacement construction of the Kleuterbach culvert


Executing companies:

Johann Bunte GmbH&Co. KG

Bad Bentheim branch


The problem:


At km 42.431 N the Dortmund-Ems Canal passes over the upper Kleuterbach culvert. The planned channel widening of the Lüdinghausen–Senden section requires that the existing culvert be replaced. This will be built using the immersed-tube-method throughout its length. Submersible pumps will be necessary for floatingthe steel pipe culverts into place and sinking them.


The solution:


Pumps of types KTZ47.5 and KRS2-69 were used to control the flooding of the steel pipes and to sink them accurately.

V prípade použitia v abrazívnom alebo korozívnom prostredí sa niektoré súčasti prirodzene opotrebujú rýchlejšie. S ohľadom na takúto aplikáciu sa opotrebenie môže týkať hlavne obežného kolesa, miešadla, sacej dosky, puzdra hriadeľa, olejového tesnenia, mechanického tesnenia, krytu čerpadla, sita, krtyu motora a spojky odtoku. V závislosti od pracovných podmienok sa životnosť týchto súčastí môže podstatne líšiť a byť kratšia než zákonná záručná doba.
Preto, prosím, vezmite do úvahy naše všeobecné zmluvné podmienky, ktoré vám na vyžiadanie zašleme poštou.