AZS ARGE Zugangsstollen, Linthal, Switzerland

The project:

Access shaft II -Kraftwerk Linth-Limmern AG "Project Linthal 2015"


Executing companies:

AZS ARGE Zugangsstollen

RL Pumpenanlagen GmbH, Wollerau


The problem:


Shafts with a pronounced tilt. drilling water and incoming water must be pumped out.


Our solution:


LH322W submersible pump is used, with a second pump held in reserve. The pump is frequency-controlled and regulated using a submersible pressure probe. If the water level rises, the speed is increased; when the water level falls, the speed is reduced. This type of control was chosen so that a very small pump container can be used which can be easily replaced after each new tunnel section. A model KTZ47.5 pump is built into the drainage water treatment.

V prípade použitia v abrazívnom alebo korozívnom prostredí sa niektoré súčasti prirodzene opotrebujú rýchlejšie. S ohľadom na takúto aplikáciu sa opotrebenie môže týkať hlavne obežného kolesa, miešadla, sacej dosky, puzdra hriadeľa, olejového tesnenia, mechanického tesnenia, krytu čerpadla, sita, krtyu motora a spojky odtoku. V závislosti od pracovných podmienok sa životnosť týchto súčastí môže podstatne líšiť a byť kratšia než zákonná záručná doba.
Preto, prosím, vezmite do úvahy naše všeobecné zmluvné podmienky, ktoré vám na vyžiadanie zašleme poštou.