Extension of connection road L639 in Gelsenkirchen

The Project:


Extension of the connection road L639,

Florastraße Gelsenkirchen

Executing company:

Heitkamp Erd- und Straßenbau GmbH


The Problem:


Repumping a mixed water channel because a shaft had to be installed.


Our Solution:


Two Tsurumi KRS822 pumped off the dammed water. 720 m³/h were re-passed into the mixed water channel at a distance of 100 m.


This took 3 weeks where the pumps were in service 24 h a day without any failure.


The pumps were laid into the bed of the channel without further installation. No problem for Tsurumi pumps.

În caz de utilizare in aplicatii cu fluide abrazive și/sau corozive, la nivelul anumitor componente va avea loc o uzură puternică. Uzura poate avea loc în principal în rotor, agitator, placa de aspirație, camasa arborelui, inelul de ungere, etanșarea mecanică, carcasa pompei, sorb, carcasa motorului și racordul de refulare. În funcție de condițiile de functionare, durata de viață a acelor piese ar putea varia semnificativ și poate fi mai scurtă decât perioada de garanție legală.