Tunnel U2/2, Vienna, Austria

The Project:


Construction of an underground railway tunnel with a length of 1500 m.


Executing company:

ARGE Tunnel U2/2 Taborstraße, Vienna, Austria

Östu-Stettin Hoch- und Tiefbau GmbH

G. Hinteregger &Söhne Bauges.m.b.H.

Wayss&Freytag Ingenieurbau AG


The problem:


Drainage of the underground tunnel heading with the aid of submersible pumps.


Our Solution:


Use of submersible pumps of the KTV series which can reliably ensure drainage in 24-hour snore mode during the heading work.

Thanks to their special properties including their internal rotating mechanical seal and upstream shaft protection sleeve with seal, the Tsurumi pumps can be operated in 24-hour snore mode.

În cazul utilizării abrazive și corozive, se va produce o uzură mai puternică în mod normal la anumite componente. În ceea ce privește aplicația de mai sus, uzura se poate produce mai ales la rotor, agitator, placa de aspirație, manșonul arborelui, inelul de ulei, garnitura mecanică, carcasa pompei, filtru, carcasa motorului și cupla de descărcare. În funcție de condițiile de lucru, durata de viață a acestor componente poate varia semnificativ și poate fi mai scurtă decât perioada de garanție legală.
În acest sens, vă rugăm să citiți cu atenție termenii și condițiile noastre generale (www.tsurumi.eu/english/GCS.htm) pe care vi le putem trimite, la cerere, și prin poștă.