Schwarzbach pipe heading, Germany

The Project:


Gelsenkirchen pipe heading, Schwarzbach canal, Germany

Executing company: WÜWA Bau GmbH


The Problem:


The material excavated by the micro-tunnelling machine is pumped by a mud pump into a separating system where coarse parts are separated. The remaining highly abrasive sludge is passed into a receiver. The material deposits due to the intermittent operation of the pump.


Our Solution:


A KRS2-80 with agitator whirls up the abrasive sludge so that it can be pumped off without any problem. Minimum wear is possible due to the application of components of grey cast and chromium cast iron (25% chromium portion).

În cazul utilizării abrazive și corozive, se va produce o uzură mai puternică în mod normal la anumite componente. În ceea ce privește aplicația de mai sus, uzura se poate produce mai ales la rotor, agitator, placa de aspirație, manșonul arborelui, inelul de ulei, garnitura mecanică, carcasa pompei, filtru, carcasa motorului și cupla de descărcare. În funcție de condițiile de lucru, durata de viață a acestor componente poate varia semnificativ și poate fi mai scurtă decât perioada de garanție legală.
În acest sens, vă rugăm să citiți cu atenție termenii și condițiile noastre generale (www.tsurumi.eu/english/GCS.htm) pe care vi le putem trimite, la cerere, și prin poștă.