Schwäbisch Gmünd Tunnel, Germany

The project:


Construction of a two-lane tunnel with escape galleries to provide a direct route through the town of Schwäbisch Gmünd without the inconvenience of traffic lights at crossings, etc.


Executing companies:

  • Company Baresel
  • Company Hinteregger+Söhne Bauges. mbH
  • Company Züblin
  • Company Ostu-Stettin

The problem:


Tunnel advance using tunnel boring methods; advance on a downhill gradient at some points; incursion of ground and fissure water to be expected; tunnel bore to pass under the River Rems. High mud content due to soluble mudstone, high risk of abrasion due to quartz content of the sandstone.


Our solution:


Approximately 30 KTZ and KTV pumps with motor ratings up to 7.5 kW are being employed. These pumps are sturdy, requiring little maintenance; if any additional ones are required these can be supplied immediately on call-off at any time.

În cazul utilizării abrazive și corozive, se va produce o uzură mai puternică în mod normal la anumite componente. În ceea ce privește aplicația de mai sus, uzura se poate produce mai ales la rotor, agitator, placa de aspirație, manșonul arborelui, inelul de ulei, garnitura mecanică, carcasa pompei, filtru, carcasa motorului și cupla de descărcare. În funcție de condițiile de lucru, durata de viață a acestor componente poate varia semnificativ și poate fi mai scurtă decât perioada de garanție legală.