Reitersberg Tunnel, Germany

The Project:

Reitersberg Tunnel of the Ebensfeld–Erfurt ICE rail link


Contractor:

Alfred Kunz Untertagebau

Swietelsky Tunnelbau

Leonhard Weiss


Tsurumi support:

Christian Kulik (Field Sales)


The Problem:

The 2975 m long tunnel is being cut using mining methods. After the snow melted, the water incidence in the tunnel suddenly rose to a maximum of 20 litres/second. The medium was made highly abrasive by its slurried stone content.


The Solution:

Massive drainage pump of types KTZ411 and KTZ611 (11kW) transport water over a distance of 500m to 1000m. The KTZ series is the perfect contractors' pump due to its good performance. The replacement of wearing parts is very simple. After training by qualified Tsurumi staff, all maintenance can be done independently on site.


În caz de utilizare in aplicatii cu fluide abrazive și/sau corozive, la nivelul anumitor componente va avea loc o uzură puternică. Uzura poate avea loc în principal în rotor, agitator, placa de aspirație, camasa arborelui, inelul de ungere, etanșarea mecanică, carcasa pompei, sorb, carcasa motorului și racordul de refulare. În funcție de condițiile de functionare, durata de viață a acelor piese ar putea varia semnificativ și poate fi mai scurtă decât perioada de garanție legală.
În acest sens, vă rugăm să acordați o atenție mare termenilor și condițiilor generale pe care le putem trimite, de asemenea prin e-mail, la cerere.