NEAT Amsteg and Erstfeld construction sites, Switzerland

The project:


New Transalpine Railway (NEAT), Amsteg and Erstfeld construction sites


Executing company:

RL Pumpenanlagen GmbH, Wollerau


The problem:


Incoming contaminated drainage water from the tunnels are guided to the collection basin of the sand press. This was initially done with standard commercial construction pumps, but the impellers were worn out after a very short time.


Our solution:


Four GPN3-80 Tsurumi mud pumps with agitator were used. This 4-pole jacket-cooled pump is designed for use in the harshest of mud environments, so that the impeller, agitators, and suction plates are fabricated of custom-coated chromium cast iron with a Brinell hardness of 415 to 425. After 6 months of use, almost no wear could be detected.

În cazul utilizării abrazive și corozive, se va produce o uzură mai puternică în mod normal la anumite componente. În ceea ce privește aplicația de mai sus, uzura se poate produce mai ales la rotor, agitator, placa de aspirație, manșonul arborelui, inelul de ulei, garnitura mecanică, carcasa pompei, filtru, carcasa motorului și cupla de descărcare. În funcție de condițiile de lucru, durata de viață a acestor componente poate varia semnificativ și poate fi mai scurtă decât perioada de garanție legală.
În acest sens, vă rugăm să citiți cu atenție termenii și condițiile noastre generale (www.tsurumi.eu/english/GCS.htm) pe care vi le putem trimite, la cerere, și prin poștă.