Moosach subway tunnel, Munich, Germany

The project:


Renovation of the U3 between the Olympia shopping centre and Moosach


Executing company:

ARGE U-Bahn Line 3 North, construction lot 2: Wayss&Freytag Ingenieurbau Hochtief Construction Bauer Spezialtiefbau


The problem:


Groundwater drainage during the entire construction phase: Laying of sewers, construction of subway tunnels and stations.


Our solution:


Multiple submersible pumps from the LSC series (puddle sucker) were used. The special characteristics of Tsurumi pumps, such as an internal mechanical seal, upstream shaft sleeve with gasket and an oil lifter allow them to be used in snore mode over an extended period.

În cazul utilizării abrazive și corozive, se va produce o uzură mai puternică în mod normal la anumite componente. În ceea ce privește aplicația de mai sus, uzura se poate produce mai ales la rotor, agitator, placa de aspirație, manșonul arborelui, inelul de ulei, garnitura mecanică, carcasa pompei, filtru, carcasa motorului și cupla de descărcare. În funcție de condițiile de lucru, durata de viață a acestor componente poate varia semnificativ și poate fi mai scurtă decât perioada de garanție legală.
În acest sens, vă rugăm să citiți cu atenție termenii și condițiile noastre generale (www.tsurumi.eu/english/GCS.htm) pe care vi le putem trimite, la cerere, și prin poștă.