Katzenberg Tunnel, Germany

The project:


Treatment and desludging of the process water from the tunnel advance.


Executing company:

Ed. Züblin Umwelttechnik GmbH


The problem:


The fluctuating accumulation of the sludge water from the Katzenberg Tunnel advance is collected in intermediate tanks. The accumulating process water should be pumped into the water treatment plant using submersible pumps.


The solution:


Tsurumi series KTZ contractors' pumps were chosen due to their reliability. Continuous, non-stop operation with high concentrations of sediment is possible with Tsurumi contractors' pumps, securing the operation of the water treatment plant.

În cazul utilizării abrazive și corozive, se va produce o uzură mai puternică în mod normal la anumite componente. În ceea ce privește aplicația de mai sus, uzura se poate produce mai ales la rotor, agitator, placa de aspirație, manșonul arborelui, inelul de ulei, garnitura mecanică, carcasa pompei, filtru, carcasa motorului și cupla de descărcare. În funcție de condițiile de lucru, durata de viață a acestor componente poate varia semnificativ și poate fi mai scurtă decât perioada de garanție legală.
În acest sens, vă rugăm să citiți cu atenție termenii și condițiile noastre generale (www.tsurumi.eu/english/GCS.htm) pe care vi le putem trimite, la cerere, și prin poștă.