The Project:


Underground railway track to link the Cologne-Bonn airport, Germany

Executing companies:

Consortium Airport tunnel Cologne-Bonn lot 3

Wayss & Freytag Ingenieurbau AG,

E. Heitkamp GmbH, F.C. Trapp AGComplete dewatering (24h-duty) carried out by:

Smet GWT N.V., Dessel, Belgien

Biergans Pumpen-Vertrieb GmbH, Duisburg



The Problem:


Open dewatering by means of submersible pumps.


Our Solution:


The groundwater generated is pumped off by several submersible pumps for abrasive water. 24-h on-snore-operation must be ensured. Currently a total of twenty KTZ21.5 and ten KTZ32.2 is in operation.

În cazul utilizării abrazive și corozive, se va produce o uzură mai puternică în mod normal la anumite componente. În ceea ce privește aplicația de mai sus, uzura se poate produce mai ales la rotor, agitator, placa de aspirație, manșonul arborelui, inelul de ulei, garnitura mecanică, carcasa pompei, filtru, carcasa motorului și cupla de descărcare. În funcție de condițiile de lucru, durata de viață a acestor componente poate varia semnificativ și poate fi mai scurtă decât perioada de garanție legală.