ARGE tunnel Achrain, Austria

The Project:


Construction of a 3,200 m long road tunnel


Executing companies:

ARGE Tunnel Achrain/Österreich

Beton- u. Monierbau Gesellschaft m.b.H.

Alpine Mayreder Bau GmbH

Jäger Bau GmbH


The Problem:


Drainage during the complete tunnel heading work.


Our Solution:


Use of type KTZ32.2 submersible pumps. These are operated in 24-hour snore mode.

Thanks to their special properties including their internal rotating mechanical seal and upstream shaft protection sleeve with seal, the Tsurumi pumps can be operated in 24-hour snore mode.


The advantages of this design are:

  • Extended service lives
  • Lower costs for spare parts
  • Lower labour costs
În cazul utilizării abrazive și corozive, se va produce o uzură mai puternică în mod normal la anumite componente. În ceea ce privește aplicația de mai sus, uzura se poate produce mai ales la rotor, agitator, placa de aspirație, manșonul arborelui, inelul de ulei, garnitura mecanică, carcasa pompei, filtru, carcasa motorului și cupla de descărcare. În funcție de condițiile de lucru, durata de viață a acestor componente poate varia semnificativ și poate fi mai scurtă decât perioada de garanție legală.