Mine in Oberwiesenthal, Germany

The project:

Mining of fluorspar and heavy spar in a newly activated mine.


Company carrying out the works:

Erzgerbirgische Fluss- und Schwerspatwerke GmbH, Oberwiesenthal, Germany


Subcontractor:

Bau Punkt Kraatz GmbH & Co.KG, Annaberg-Buchholz


Tsurumi supervisor:

Mr. Thomas Elendt (Field Sales Team East)


The problem:

Water penetrates the top of the mining shaft, washing away many sediments with a diameter of 0.1 mm to 0.2 mm. Both pumps and hoses quickly wear out under these conditions; the previous pumps had to be replaced approx. every six months.


The solution:

A Tsurumi type KTV2-22 construction pump, with a special pump housing made of PU rubber in 80A shore hardness, used in 24-hour continuous operations. The oldest pump of this kind operated continuously for 2.5 years without intensive maintenance. After an overhaul, only the mechanical seal, impeller, and the shaft protection housing, had to be exchanged.

No caso de uma utilização abrasiva e corrosiva, certos componentes sofrerão um desgaste natural. No que respeita à aplicação anterior, o desgaste pode decorrer sobretudo no impulsor, agitador, placa de sucção, manga do veio, anel de óleo, vedação mecânica, revestimento da bomba, filtro, revestimento do motor e acoplamento de descarga. Dependendo das condições de trabalho, a vida útil daquelas peças pode variar significativamente e pode ser mais reduzida do que o período legal da garantia.