Tunnel Siegkreisel, Betzdorf

The Project:


Construction of a 360 m long tunnel with three lanes as component of a municipal bypass system; completion: Spring, 2006.


Executing company:

ARGE Tunnel Tunnel Siegkreisel, Betzdorf

Hochtief Construction AG

Kirchner Bau GmbH

Alpine Bau Deutschland GmbH


The Problem:


Pumping off of the water arising during the underground tunnel heading.


Our Solution:


Use of submersible pumps of type KTZ32.2, these being operated in permanent snore mode (dry running) during the complete construction period. This application is no problem for the pump thanks to the inhouse developed oil distributor in combination with the rotating mechanical seal, which is located completely internally.

No caso de uma utilização abrasiva e corrosiva, certos componentes sofrerão um desgaste natural. No que respeita à aplicação anterior, o desgaste pode decorrer sobretudo no impulsor, agitador, placa de sucção, manga do veio, anel de óleo, vedação mecânica, revestimento da bomba, filtro, revestimento do motor e acoplamento de descarga. Dependendo das condições de trabalho, a vida útil daquelas peças pode variar significativamente e pode ser mais reduzida do que o período legal da garantia.
A este propósito, atente aos nossos termos e condições gerais que também lhe enviamos por email, se solicitado.