Tunnel project U3, Munich

The project:


Construction of underground tunnel line 3 North, lot 1

Execution companies:

Consortium U-Bahn Linie 3 Nord

Ed. Züblin AG, Ndl. Tunnelbau

Ed. Züblin AG, Ndl. München


The problem:


Pumping off the water arising during mined underground tunnel heading.


Our solution:


Use of 9 submersible waste water pumps of Type KTZ32.2.

Because of the highly calcareous water deposits occur in the pump hydraulics resulting in pump blocking. However, due to the mechanical seal positioned completely inside und the additional shaft protection sleeve with sealing ring the pump can be put quickly with little effort and without exchanging any wear parts back into operation again.

No caso de uma utilização abrasiva e corrosiva, certos componentes sofrerão um desgaste natural. No que respeita à aplicação anterior, o desgaste pode decorrer sobretudo no impulsor, agitador, placa de sucção, manga do veio, anel de óleo, vedação mecânica, revestimento da bomba, filtro, revestimento do motor e acoplamento de descarga. Dependendo das condições de trabalho, a vida útil daquelas peças pode variar significativamente e pode ser mais reduzida do que o período legal da garantia.
A este propósito, atente aos nossos termos e condições gerais que também lhe enviamos por email, se solicitado.