Direkt zum Inhalt | Direkt zur Navigation
Encontra-se aqui:

Moosach subway tunnel, Munich, Germany

The project:


Renovation of the U3 between the Olympia shopping centre and Moosach


Executing company:

ARGE U-Bahn Line 3 North, construction lot 2: Wayss&Freytag Ingenieurbau Hochtief Construction Bauer Spezialtiefbau


The problem:


Groundwater drainage during the entire construction phase: Laying of sewers, construction of subway tunnels and stations.


Our solution:


Multiple submersible pumps from the LSC series (puddle sucker) were used. The special characteristics of Tsurumi pumps, such as an internal mechanical seal, upstream shaft sleeve with gasket and an oil lifter allow them to be used in snore mode over an extended period.

No caso de uma utilização abrasiva e corrosiva, certos componentes sofrerão um desgaste natural. No que respeita à aplicação anterior, o desgaste pode decorrer sobretudo no impulsor, agitador, placa de sucção, manga do veio, anel de óleo, vedação mecânica, revestimento da bomba, filtro, revestimento do motor e acoplamento de descarga. Dependendo das condições de trabalho, a vida útil daquelas peças pode variar significativamente e pode ser mais reduzida do que o período legal da garantia.
A este propósito, atente aos nossos termos e condições gerais que também lhe enviamos por email, se solicitado.