Direkt zum Inhalt | Direkt zur Navigation
Encontra-se aqui:

Katzenberg Tunnel, Germany

The project:


Treatment and desludging of the process water from the tunnel advance.


Executing company:

Ed. Züblin Umwelttechnik GmbH


The problem:


The fluctuating accumulation of the sludge water from the Katzenberg Tunnel advance is collected in intermediate tanks. The accumulating process water should be pumped into the water treatment plant using submersible pumps.


The solution:


Tsurumi series KTZ contractors' pumps were chosen due to their reliability. Continuous, non-stop operation with high concentrations of sediment is possible with Tsurumi contractors' pumps, securing the operation of the water treatment plant.

No caso de uma utilização abrasiva e corrosiva, certos componentes sofrerão um desgaste natural. No que respeita à aplicação anterior, o desgaste pode decorrer sobretudo no impulsor, agitador, placa de sucção, manga do veio, anel de óleo, vedação mecânica, revestimento da bomba, filtro, revestimento do motor e acoplamento de descarga. Dependendo das condições de trabalho, a vida útil daquelas peças pode variar significativamente e pode ser mais reduzida do que o período legal da garantia.
A este propósito, atente aos nossos termos e condições gerais que também lhe enviamos por email, se solicitado.