Direkt zum Inhalt | Direkt zur Navigation
Encontra-se aqui:

Cologne/Bonn airport connection, Germany

The Project:


Connection of the newly built road for Cologne/Bonn airport

Executing Company

Heitkamp GmbH, Wayss&Freytag AG,

Trapp GmbH


The Problem:


Maintainance of water level in a rainwater storage basin at the building site.


Our Solution:


Installation of 2 submersible pumps KTVE21.5 and KTVE22.2. The advantage here is in the integrated level control unit via electrodes. A separate floater cable does not have to be laid. The space required is determined by the diameter of the pump. In contrast to floaters, electrodes do not have to be readjusted. The level can be varied without any difficulty by mounting a screw.

No caso de uma utilização abrasiva e corrosiva, certos componentes sofrerão um desgaste natural. No que respeita à aplicação anterior, o desgaste pode decorrer sobretudo no impulsor, agitador, placa de sucção, manga do veio, anel de óleo, vedação mecânica, revestimento da bomba, filtro, revestimento do motor e acoplamento de descarga. Dependendo das condições de trabalho, a vida útil daquelas peças pode variar significativamente e pode ser mais reduzida do que o período legal da garantia.
A este propósito, atente aos nossos termos e condições gerais que também lhe enviamos por email, se solicitado.